It Takes the Blacksburg Shipyard Twenty Six Weeks with 500

Question 100

Multiple Choice
It takes the Blacksburg shipyard twenty six weeks with 500 workers to build a small tanker. Material costs are $32 million and overhead costs are $2 million. Workers cost $40 per hour including benefits and work 40 hours per week. The ship sells for $75 million. What is the multifactor productivity ratio?
A) less than 1.0
B) greater than 1.0 but less than or equal to 2.0
C) greater than 2.0 but less than or equal to 3.0
D) greater than 3.0

It takes the Blacksburg shipyard twenty six weeks with 500 workers to build a small tanker. Material costs are $32 million and overhead costs are $2 million. Workers cost $40 per hour including benefits and work 40 hours per week. The ship sells for $75 million. What is the multifactor productivity ratio?


A) less than 1.0
B) greater than 1.0 but less than or equal to 2.0
C) greater than 2.0 but less than or equal to 3.0
D) greater than 3.0

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents