A manufacturer embarking on a Six Sigma program sets the goal of having True Six Sigma capability for all processes by the end of the month. If their current process capability index on a key metric is less than 2.0 and the process capability ratio is 1.0, what must happen with the process standard deviation?
A) The process standard deviation must be doubled.
B) The process standard deviation must be reduced by a factor of six.
C) The process standard deviation must be cut in half.
D) The process tolerances should be doubled.
Correct Answer:
Verified
Q175: MKS Inc., produces meter sticks that have
Q176: The upper and lower specification limits for
Q177: The ISO 9001:2008 standard:
A) emphasizes corporate leadership
Q178: A manufacturer enjoys both a Cpk and
Q179: The Baldrige Performance Excellence Program considers a
Q181: Management by fact is required for which
Q182: What are the benefits of ISO certification?
Q183: The _ section of the Baldrige Performance
Q184: Explain the difference between the Baldrige Performance
Q185: Rejecting product materials due to poor quality
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents