Solved

Management at Pepman Has Decided to Switch from a Push

Question 68

Multiple Choice
Management at Pepman has decided to switch from a push system to a pull system of manufacturing. They are a large repetitive manufacturer of bicycles. Which one of the following is most likely to occur?
A) The cycle time will increase, resulting in higher inventory levels.
B) The space required will increase due to the increase in the number of units that require rework.
C) The decrease in WIP inventory levels will reduce the space requirements.
D) The workers at any given process will produce units before they are needed by the subsequent process.

Management at Pepman has decided to switch from a push system to a pull system of manufacturing. They are a large repetitive manufacturer of bicycles. Which one of the following is most likely to occur?


A) The cycle time will increase, resulting in higher inventory levels.
B) The space required will increase due to the increase in the number of units that require rework.
C) The decrease in WIP inventory levels will reduce the space requirements.
D) The workers at any given process will produce units before they are needed by the subsequent process.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents