Which of the following statements is TRUE about pegging?
A) It traces downward in the BOM from the parent item to the component.
B) It causes system nervousness.
C) It allows a segment of the master schedule to be designated as "not to be scheduled."
D) It allows the production planner to determine the cause for the requirement and make a judgment about the necessity for a change in the schedule.
E) It is an excellent tool for make-to-order environments.
Correct Answer:
Verified
Q63: Product A is made from 2 Bs
Q64: _ are the time units in a
Q65: Which of the following is NOT one
Q66: What is the process of tracing upward
Q67: In MRP, system nervousness is caused by:
A)
Q69: An order for 150 units of Product
Q70: Consider the product structure shown below.
(a) Assuming
Q71: MRP is an excellent tool for scheduling
Q72: An order for 110 units of Product
Q73: What is one of the tools that
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents