The formula for the expected time of an activity in a network assumes that the optimistic, pessimistic, and most likely time estimates have a beta distribution.
Correct Answer:
Verified
Q30: An activity using slack does not impact
Q31: "Merger" is a term used to describe
Q32: When conducting risk analysis on a project,
Q33: The tasks of project planning, project budgeting,
Q34: A project schedule is a project action
Q36: Events in a project consume no resources
Q37: A situation where two or more activities
Q38: The movement from left to right through
Q39: A disadvantage of using beta distribution to
Q40: Activities on a project always meet the