In lean operations, when work is completed at one work center, it is important to immediately move the completed work to the next work center to minimize idle time.
Correct Answer:
Verified
Q28: Setup time and its associated cost can
Q29: Lean systems often use layouts that are
Q30: In lean operations, a responsibility of the
Q31: The use of small lot sizes in
Q32: Preventive maintenance will eliminate the need to
Q34: A real advantage of the lean philosophy
Q35: In the lean approach, inventories are reduced
Q36: In a pull system, the accumulation of
Q37: One problem with lean operations is that
Q38: In the lean philosophy, the larger the