ABC Corporation allocates overhead based on direct labor cost.Assume ABC expects to incur a total of $1,025,000 in overhead costs and $820,000 in direct labor costs.Actual overhead costs incurred totaled $1,050,000 and actual direct labor costs totaled $800,100.ABC's predetermined overhead rate is closest to
A) 125% of direct labor cost.
B) 128% of direct labor cost.
C) 98% of direct labor costs.
D) 100% of direct labor costs.
Correct Answer:
Verified
Q75: The standard price of direct labor does
Q76: Jody Jewelry manufactures jewelry.In October Jody is
Q77: The time needed to produce one unit
Q78: The difference in standard price and standard
Q79: The predetermined overhead rate is calculated by
A)dividing
Q81: In order to prepare the sales budget,
Q82: Which of the following is not a
Q83: Which of the following is not a
Q84: Jody Jewelry manufactures jewelry.It applies overhead based
Q85: Which of the following is not a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents