Mike, a plumbing contractor, was hired to correct a stoppage in the sewer line at Sarah's house. During his work, he discovered numerous leaks in a rusty, defective water pipe that ran parallel with the sewer line. To meet public regulations, the water pipe had to be replaced either then or later, when the yard would have to be redug. Mike replaced the water pipe and Sarah inspected the work daily and did not object to the extra work. When Mike finished, Sarah refused to pay for the water pipe replacement since that was not what she originally hired Mike to do and she had never specifically agreed to that work. Sarah must pay Mike for his labor and materials costs for both the sewer and water line repair.
Correct Answer:
Verified
Q22: An implied in fact contract is formed
Q30: The requirement that each party to a
Q32: Alfred makes a material misrepresentation of fact
Q34: In addition to the four basic requirements
Q34: A noncontractual promise may be enforceable where
Q37: The United Nations Convention on Contracts for
Q38: A contract to sell life insurance is
Q38: Thomas contacted Welsh, a realtor, and asked
Q39: Ronald says to Evan, "If you design
Q40: Alfred makes a material misrepresentation of fact
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents