A contract was made for 125 bales of cotton to arrive on a ship named "Peerless" from Bombay. Unbeknownst to either party to the contract, there were two ships named "Peerless," both of which were sailing from Bombay. One sailed in October and the other in December. The buyer had in mind the ship sailing in October, but the seller had in mind the ship sailing in December. Each party held his belief in good faith. When the goods failed to arrive on time, the buyer sued for breach of contract. The court found:
A) the seller was in breach and must pay damages.
B) the seller was guilty of fraud in the inducement for failing to disclose to the buyer which ship would contain the goods.
C) no contract existed due to mistake in meaning of terms.
D) the buyer must accept the goods sent in December since he did not specify the October sailing date and the seller sent them in good faith.
Correct Answer:
Verified
Q42: Which of these statements about duress is
Q43: An arm's-length transaction is one in which:
A)
Q44: Sam wants to sell his golden retriever
Q46: In the Berardi v. Meadowbrook Mall Company
Q48: Stewart entered into a contract with Will
Q49: Tom tries to sell his Aston-Martin to
Q50: A contract induced by threatening to bring
Q51: Scienter is a legal term which means:
A)
Q52: Under the Restatement, if the parties to
Q54: Which of the following is NOT an
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents