In planning for a file system conversion to a new physical location, it is wise to schedule the actual conversion process to occur
A) during a Joint Commission survey.
B) during a 2-week period when the department is closed.
C) at an off-peak time for the department such as a weekend (Friday to Monday) .
D) before purging inactive records.
Correct Answer:
Verified
Q142: When a health care facility makes a
Q143: When purchasing file guides, the Health Information
Q144: As Directory of the HIM Department you
Q145: Which one of the following master patient
Q146: Unless state or federal laws require longer
Q148: A major consideration in a hospital or
Q149: In negotiating a contract with a commercial
Q150: A health information manager develops a formal
Q151: Which of the following is a DISADVANTAGE
Q152: The master patient index must, at a
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents