A Belt working in a supply chain environment has to make a decision to change suppliers of critical raw materials for a new product upgrade. The purchasing manager is depending on the Belt's effort requiring that the average cost of an internal critical raw material component be less than or equal to $4,200 in order to stay within budget. Using a sample of 35 first article components, a Mean of the new product upgrade price of $4,060, and a Standard Deviation of $98 was estimated. Select the answer that best states the Practical Problem.
A) If the average cost per component is $4,200 or less, then the purchase manager will introduce the new product upgrade with new components.
B) If the average cost per component is greater than $4,200, then the purchase manager will introduce the new product upgrade with new components.
C) Only if the average cost per product upgrade is $4,060, will the purchase manager introduce new product upgrades with new components.
D) If the average cost per new product upgrade is less than $180, then the purchase manager will introduce the new product upgrade with new components.
Correct Answer:
Verified
Q1: Which statement(s) are incorrect for the Regression
Q2: Fractional Factorial designs are used to reduce
Q4: Which of these might contribute to similar
Q5: Which statement is NOT correct about the
Q6: When a Belt decides to use written
Q7: A Full Factorial experiment using a 3
Q8: When a Belt conducts a Linear Correlation
Q9: A Factorial Experiment based on a Level
Q10: When doing Hypothesis Testing on Non-normal data
Q11: A valid mathematical Regression represents all of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents