An installation engineer is installing the power connections to the ACP 4200. What must the installation engineer be aware of?
A) Before connecting the power, the power switches of all components in the rack must be in the OFF position.
B) Power cables must only access the rack from the top of the rack.
C) Power connections must be within 10 feet (3 meters) of the rack.
D) Power cables must only access the rack from the bottom of the rack.
Correct Answer:
Verified
Q2: What is the purpose of the VMware
Q3: Refer to the exhibit. Q4: How would an administrator display the IP Q5: When an administrator logs into Avaya Orchestrator Q6: An ACP 4200 engineering team is considering Q8: Refer to the exhibit. Q9: A new instance/customer and new VMs are Q10: Which statement about the factory default configuration Q11: Refer to the exhibit. Q12: Avaya Orchestrator monitors the ACP 4200 components Unlock this Answer For Free Now! View this answer and more for free by performing one of the following actions Scan the QR code to install the App and get 2 free unlocks Unlock quizzes for free by uploading documents![]()
![]()
![]()