Which action must be performed before renumbering a Cisco UCS chassis?
A) Run the shut and no shut command on the connected ports.
B) Move the chassis to new ports on fabric interconnect.
C) Decommission the chassis.
D) Re-acknowledge the chassis.
Correct Answer:
Verified
Q125: An engineer must configure OSPF routing on
Q126: Which MAC address is an HSRP version
Q127: A network architect must redesign a data
Q128: An engineer must configure a VXLAN routing
Q129: What is a characteristic of the install
Q131: What happens to the default host firmware
Q132: Q133: A network engineer must perform a backup Q134: After a Cisco Nexus 7000 Series Switch Q135: Refer to the exhibit.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents