Refer to the exhibits. Exhibit 1
Exhibit 2
A network administrator adds a new Mobility Controller (MC) to the production Mobility Master (MM) and deploys APs that start broadcasting the employees SSID in the West wing of the building. Suddenly, the employed report client disconnects. When accessing the MM the network administrator notices that the MC is unreachable, then proceeds to access the MC's console and obtains the outputs shown in the exhibits. What should the network administrator do next to solve the current problem?
A) Decommission the MC from the MM, and add it again.
B) Open a TAC case, and send the output of tar crash.
C) Verify the license pools in the MM.
D) Kill two zombie processes, then reboot the MC.
Correct Answer:
Verified
Q12: Refer to the exhibits. Exhibit1 
Q13: Refer to the exhibit. Q14: Refer to the exhibit. Q15: Refer to the exhibit. Q16: A customer with a multi-controller network upgrades Q18: An organization owns a fully functional multi-controller Q19: Refer to exhibit. Q20: Refer to the exhibits. Exhibit1 Q21: Refer to the exhibit. Q22: A foreign exchange broker in a shared Unlock this Answer For Free Now! View this answer and more for free by performing one of the following actions Scan the QR code to install the App and get 2 free unlocks Unlock quizzes for free by uploading documents![]()
![]()
![]()
![]()

![]()