A technician is buying a PC that will host three VMs running at the same time with the current configuration. The technician believes there might be a need to run several additional VMs in the near future. Which of the following resources would be the MOST important to upgrade to allow for the additional VMs?
A) CPU
B) SSD
C) NIC
D) RAM
Correct Answer:
Verified
Q416: Which of the following wireless networking protocols
Q417: An inkjet printer shows a print-head quality
Q418: A technician is installing and configuring a
Q419: A laptop is being upgraded. The machine
Q420: A user is no longer able to
Q422: Which of the following is used to
Q423: A user notices the system clock is
Q424: Which of the following terminates a coaxial
Q425: A technician needs to routinely run scripting
Q426: The feature that allows users to store
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents