As per the Risk and Return evaluation matrix for Six Sigma projects,projects that are low hanging fruit have a
A) low risk factor and low return factor.
B) high risk factor and low return factor.
C) low risk factor and high return factor.
D) high risk factor and high return factor.
Correct Answer: