What is the correct formula for the direct material usage variance?
A) (The direct materials that should have been used in actual production - the actual direct materials used in actual production) x the actual cost for one unit of direct material.
B) Actual expenditure on direct materials used in actual production - expected expenditure on direct materials used in actual production.
C) What the direct materials used in actual production should have cost - what the direct materials used in actual production actually cost.
D) (The direct materials that should have been used in actual production - the actual direct materials used in actual production) x the standard cost for one unit of direct material.
Correct Answer:
Verified
Q4: A standard cost card includes just details
Q5: A standard cost is just a best
Q6: A standard cost card includes details of
Q7: What is the correct formula for the
Q8: What is the correct formula for the
Q10: Maria bakes and sells cakes for special
Q11: ABC Limited uses a standard costing system
Q12: MSC Limited uses a standard costing system
Q13: ZTC Limited uses a standard costing system
Q14: Zany Cushion Covers Limited uses a standard
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents