Potters Limited uses a standard costing system for all its products. Potters Limited produces hand painted teapots. The standard direct labour time to paint one teapot is 1½ hours. Variable overhead is allocated to each teapot on the basis of £6 per labour hour. Budgeted production is 1,500 teapots per month with budgeted monthly labour hours of 2,250. In October, Potters Limited produced 1,480 teapots and incurred total variable overhead expenditure of £13,000. 2,205 labour hours were paid in October. What is the variable overhead efficiency variance for October?
A) £90 Favourable
B) £180 Favourable
C) £230 Favourable
D) £320 Favourable
Correct Answer:
Verified
Q39: What is the correct formula for the
Q40: Which one of the following is the
Q41: What is the correct formula for the
Q42: Maria's bakery bakes and sells cakes for
Q43: ABC Limited uses a standard costing system
Q44: XTA Limited uses a standard costing system
Q45: XDT Limited uses a standard costing system
Q47: QRS Limited uses a standard costing system
Q48: ZDT Limited uses a standard costing system
Q49: The Pottery Limited uses a standard costing
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents