When preparing a cost-benefit analysis, design costs incurred in the systems planning, systems analysis and conceptual design phases of the Systems Development Life Cycle are relevant costs.
Correct Answer:
Verified
Q4: When the nature of the project and
Q7: Legal feasibility identifies conflicts between the proposed
Q12: A tangible benefit can be measured and
Q13: In the conceptual design phase of the
Q14: The first step in the SDLC is
Q16: Because of the robustness of modern technology,
Q19: System maintenance is often viewed as the
Q20: Existing (maintained) applications are the prototypes for
Q23: The testing of individual program modules is
Q29: An example of a tangible benefit is