The design firm notices that a large item on a project has accidently been left off the specifications. The design firm needs to inform bidders of the changes in the contract documents and the contract has not yet been awarded, they should issue:
A) A change order
B) An addendum
C) An alternative specification form
D) A condition change form
Correct Answer:
Verified
Q43: In a typical home 2 x 8
Q44: Which of the following statements is True
Q45: The form identifying deficiencies to be corrected
Q46: Define a Post Occupancy Evaluation (POE):
A)It is
Q47: The form that is completed by the
Q49: ABC design firm is working on their
Q50: The bank project has run into more
Q51: The ABC Design Firm states their contract
Q52: What does a reflective ceiling plan include?
A)List
Q53: If design firm ABC wanted to add
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents