A method of estimating is called the stick method and still used by many contractors today even though it's not as timely on getting a bid out. All of the following are processes of the stick method of estimating except:
A) Each subcontractor is asked to give a price on the exact specification for the job.
B) Standard labor and material costs are established for each item.
C) Each subcontractor reviews the plans and visits the job site.
D) A complete materials list is made for the job.
Correct Answer:
Verified
Q72: The Johnsons are remodeling their kitchen. They
Q73: The clients live in a dry part
Q74: ABC Window and Door Company have been
Q75: The design coordinator for the new law
Q76: When a designer provides detail drawings what
Q78: Choosing paint finishes is a normal part
Q79: Fabrics are measured in their wear by
Q80: The Designer needs to specify the best
Q81: When it comes to quality of paint,
Q82: The carpet manufacturer dyes its carpet after
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents