What is an auditor's evaluation of a statistical sample for attributes when a test of 100 documents results in 4 deviations, assuming the tolerable deviation rate is 5%, the expected population deviation rate is 3% and the allowance for sampling risk is 2%?
A) Modify planned reliance on the control because the tolerable rate plus the allowance for sampling risk exceeds the expected population deviation rate.
B) Accept the sample results as support for planned reliance on the control because the tolerable rate less the allowance or sampling risk equals the expected population deviation rate.
C) Modify planned reliance on the control because the sample deviation rate plus the allowance for sampling risk exceeds the tolerable rate.
D) Accept the sample results as support for planned reliance on the control because the sample deviation rate plus the allowance for sampling risk exceeds the tolerable rate.
Correct Answer:
Verified
Q51: In audit sampling, an advance estimate of
Q52: The acceptable risk of assessing control risk
Q53: In estimating the population misstatement, the first
Q54: The relationship between sample size and the
Q55: Statistical theory proves that in most types
Q57: When an auditor performs tests of details
Q58: Which one of the following statements regarding
Q59: Of the four factors which determine the
Q60: The allowable risk of overreliance (ARO)has a
Q61: In monetary-unit sampling, items containing large understatement
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents