Longer term benefits that are considered very difficult to quantify are called _______ .
A) direct benefits.
B) assessable benefits.
C) indirect benefits.
D) intangible benefits.
Correct Answer:
Verified
Q12: _ time is the time between start
Q13: Project planning is an _ process.
A)continuous.
B)iterative.
C)time consuming.
D)conventional.
Q14: _ is a collection of projects that
Q15: The standard way of evaluating the economic
Q16: The costs that include the salaries and
Q18: _ will indicate when expenditure and income
Q19: _ is the time taken to break
Q20: The calculation of _ is a project
Q21: Number of interrelated activities can be organized
Q22: The alternate name for Waterfall model is
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents