Heavy equipment, such as excavating machinery, trucks, dumpers, etc. should be kept away from the excavated sides at a distance not less than the depth of trench
A) Agree
B) Disagree
C) none
D) all
Correct Answer:
Verified
Q3: Full width of road should be taken
Q4: Pile drivers should be kept near electricity
Q5: Before starting piling work, a complete knowledge
Q6: If work of piling is to be
Q7: Moving parts of all equipment should be
A)Removed
B)Provided
Q9: Excavated material should be kept nearby from
Q10: Whenever workmen have to excavate in trenches
Q11: Outputs of management control level is
A)Goals and
Q12: Special one time reports are information system
Q13: Formal reports are information system used by
A)Head