Commercial power generation from fusion reactor is not yet possible, because
A) it is difficult to initiate fusion reaction
B) the fuel required (e.g. deuterium and tritium) is scarce
C) it is difficult to control fusion reaction
D) quantity of fuel required for initiating fusion reaction is prohibitively high
Correct Answer:
Verified
Q14: Nuclear plant is located near the area
Q15: Which of the following may be used
Q16: Which of the following may not need
Q17: One amu is equivalent to?
A)931 MeV
B)93.1 eV
C)9.31
Q18: Fast breeder reactors do not
A)use molten
Q19: A boiling water reactor is the one,
Q21: Thermal shield is used in high powered
Q22: Where was the first control fission of
Q23: Which was the first country to develop
Q24: How many percentage of fissionable U-235
A)0.1%
B)0.5%
C)0.7%
D)1.5%
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents