Lead time is the total time required to manufacture a product, including the order preparation time, queue time, setup time, process time, movement within factory, inspection time, and placement in inventory. An inventory cycle begins once a product is placed in inventory. The number of times that inventory cycles per year is known as which of the following:
A) Cycle time of the process.
B) Inventory turn.
C) Manufacturing lead time.
D) TAKT Time.
Correct Answer:
Verified
Q29: Rework measures are critical to operationally monitoring
Q30: Overall Equipment Effectiveness is a composite metric
Q31: Which of the following key lean measures
Q32: Takt time is a measure which calculates
Q33: Cycle time is a key lean measurement
Q35: Which of the following lean cost metrics
Q36: A Six Sigma Greenbelt is calculating key
Q37: Queue times are important lean measures in
Q38: A hospital is trying to improve patient
Q39: Which key lean measure for "delays" would
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents