The management of Green Energy Manufacturing is analyzing variable overhead variances for the fiscal period just ended. The flexible budget called for $176,000 in variable overhead but actual variable overhead was $100,000. In computing the overhead variances, Green's management discovered that it had used 40,000 pounds of direct material, rather than the budgeted amount of 44,000 pounds. (Pounds of direct material is the single overhead driver of variable overhead) . The standard variable overhead rate per pound of direct material is $2.00.
What is Green's variable overhead efficiency variance?
A) $16,000 (F)
B) $ 8,000 (F)
C) $24,000 (U)
D) $ 8,000 (U)
Correct Answer:
Verified
Q31: Which factor listed below is a cause
Q32: Which factor listed below is a possible
Q33: If the actual labor rate exceeds the
Q34: A materials price variance is computed as
Q35: Who of the following individuals is most
Q37: The management of Green Energy Manufacturing is
Q38: The variable overhead efficiency variance measures:
A) The
Q39: Lance Production Company has the following information:
Q40: The difference between the standard variable overhead
Q41: The variance that measures the amount of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents