The annual capacity of a machine is 12,000 hours, with the balance being taken for routine maintenance. It takes 10 hours to process one job (each job = 1 batch) ,. Altogether, there are seven employees who operate the machine at different times. Orders for the first six months of the year, which are typical, have averaged 50 jobs per month. The company expects 300 orders over the next six months.
Which of the following is TRUE?
A) Expected capacity utilization = 700 batches.
B) Expected capacity utilization = 650 batches.
C) Expected capacity utilization = 600 batches.
D) Average waiting time is not relevant when expected capacity utilization is less than capacity.
E) Waiting time for at least one order will be nil.
Correct Answer:
Verified
Q20: A cost analyst collected the following information
Q21: Birch Canvas and Tarp manufactures canvas products
Q22: Tessmer Manufacturing Company produces inventory in a
Q23: Wimmer's Storage ran its freezer in February,
Q24: The managers of the production department have
Q26: Quick Shop Printing has two workstations, cutting
Q27: Brown Laundry has a variable demand. The
Q28: Canevil Unlimited makes small motorcycles. The monthly
Q29: Brix, Inc. prepares frozen food for fast-food
Q30: Sof-T, Inc. manufactures foam products for upholstery
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents