Avondale Shipyards is responsible for a variety of large commercial and defense shipbuilding. These projects produce extremely large ships that each are tailor-made by hundreds of workers to meet certain specifications. Some ships can take up to three years to construct. This process represents which of the following?
A) fixed-position layout
B) composite layout
C) variable-position layout
D) hybrid layout
E) systematic layout
Correct Answer:
Verified
Q90: Survey data show that manufacturing location decisions
Q91: Johnson Products is planning to open a
Q92: Proximity to markets, favorableness of labor climate,
Q93: Systems at the flexible-purpose extreme, which must
Q94: At Conner Electronics, Peter Welch, an industrial
Q96: Operating decisions that are made frequently, are
Q97: As a shift manager for Starlite, Nicole
Q98: Sarah Williams is currently making rough production
Q99: John Horne, the CEO of Navistar International,
Q100: Realizing that they were early in the
Unlock this Answer For Free Now!