Value engineering can best be described as????
A) Reducing cost by reducing quality
B) Getting the best value for the least cost
C) Reducing scope to achieve budget
D) Reorganizing the project team to achieve the greatest efficiency
E) None of the above
Correct Answer:
Verified
Q26: Which of the project types listed would
Q27: The architect is most heavily involved during
Q28: In a Design/Bid/Build contractual arrangement, the architect
Q29: The term fast track means????
A) Design/build
B) Construction
Q30: The developer of a 40-story high-rise office
Q32: Construction management is superior to Design/Bid/Build approaches
Q33: The advantage(s) of a Design/Bid/Build contractual arrangement
Q34: A good construction manager has strong ????skills.
A)
Q35: Career opportunities as a construction professional would
Q36: Which of the following is true of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents