Cost control can be approached as an application of Pareto's law, which states that ????percent of a project's outcome is determined by ????percent of the included elements.
A)
B)
C)
D)
E)
Correct Answer:
Verified
Q51: Learning curve and work schedule studies
Q52: In reporting, a variance can best be
Q53: In which of the design phases listed
Q54: In preparing an estimate, ???? costs account
Q55: The ????section of the bid package might
Q57: Value engineering can best be described
Q58: Time sheets and equipment use reports are
Q59: The process of identifying and evaluating contractors
Q60: The ????type of schedule is graphically simple,
Q61: Owner involvement is highest during which project
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents