A work cell is required to make 140 computerized diagnostic assemblies (for installation into hybrid automobiles) each day. The cell currently works an eight hour shift, of which seven hours is available for productive work. These assemblies require five operations. Standard times for these operations are: Operation A, 3.0 minutes, B, 1.8 minutes, C, 2.4 minutes, D, 2.5 minutes, and E, 1.4 minutes. What is takt time for this cell?
How many workers will be needed to achieve this schedule?
Use the grid below to construct a work balance chart for this cell.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q99: A work cell is required to make
Q150: An electronics manufacturer makes remote control
Q151: A work cell is required to make
Q152: A manufacturing work cell has a takt
Q153: Cyclone Appliances has developed a new
Q154: Hemo-tech, Inc., a biomedical technology and
Q156: A firm operates a flow shop
Q157: The flow and distance data in
Q158: A company is trying to balance production
Q160: A firm is planning to set
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents