
A production line is to be designed for a job with three tasks. The task times are .3 minutes, 1.4 minutes, and .7 minutes. For a single production line with no parallel activities, the minimum cycle time in minutes is:
A) .3.
B) .7.
C) 1.4.
D) 2.4.
E) .8.
Correct Answer:
Verified
Q63: Layout design has many objectives, one of
Q65: Which of the following is not true
Q70: An example of automated services is
A)online banking.
B)build
Q71: Laser technology used in surgical procedures is
Q72: Which one of the following is not
Q74: The minimum possible cycle time in a
Q75: Which of the following is not a
Q76: Daily capacity of a product layout is
Q79: In a product layout, the task of
Q80: The type of layout which features departments
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents