As long as the bottleneck operations are used effectively, idle time in non-bottleneck operations will not affect the overall productivity of the system.
Correct Answer:
Verified
Q9: Line balancing is a major factor in
Q10: Infinite loading and finite loading are two
Q11: Loading is the determination of which work
Q12: Sequencing is concerned with the order in
Q13: Scheduling in intermediate-volume systems has three basic
Q15: A Gantt chart is a basic scheduling
Q16: Input/output (I/O)control refers to monitoring the productivity
Q17: The assignment model seeks an optimum matching
Q18: The elimination of idle time on both
Q19: A schedule chart depicts the loading and