
Consider the following work breakdown structure: 
What is the estimated expected (mean) time for project completion?
A) 100 days
B) 140 days
C) 199 days
D) 200 days
E) 440 days
Correct Answer:
Verified
Q87: Consider the following work breakdown structure:
Q88: A project is represented by the following
Q89: Consider the following work breakdown structure:
Q90: Consider the following work breakdown structure:
Q91: Consider the following work breakdown structure:
Q93: Consider the following work breakdown structure:
Q94: Consider the following work breakdown structure:
Q95: Consider the following work breakdown structure:
Q96: A project is represented by the following
Q97: Consider the following work breakdown structure:
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents