If all other factors specified in an attributes sampling plan remain constant,changing the specified tolerable rate from 8% to 6%,and changing the specified risk of assessing control risk too low from 7% to 3% would cause the required sample size to:
A) Increase.
B) Remain the same.
C) Decrease.
D) Change by 4%.
Correct Answer:
Verified
Q56: The 4,000 accounts receivable of GHI Company
Q57: Assume a mean-per-unit estimation variables sampling application
Q58: What effect does increasing the risk of
Q59: To determine sample size in an attribute
Q60: An important statistic to consider when using
Q62: Which of the following statistical selection techniques
Q63: Use of the ratio estimation sampling technique
Q64: In testing accounts receivable,an auditor sends out
Q65: There are many kinds of statistical estimates
Q66: Which of the following factors does an
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents