The exception rate that the auditor will permit in the population and still be willing to use the preliminary control risk assessment is called the
A) acceptable exception rate.
B) estimated population exception rate.
C) sample exception rate.
D) tolerable exception rate.
Correct Answer:
Verified
Q83: The auditor focuses on the lower limit
Q84: Auditors often use the _ to determine
Q85: Which of the following is the exception
Q86: The exception rate the auditor will permit
Q87: If the auditor decides to assess control
Q89: Which of the following would have the
Q90: If an auditor judgmentally selects a sample
Q91: Place the following steps in their proper
Q92: What types of exceptions are auditors most
Q93: When analyzing exceptions, the auditor should keep