When it was originally developed, PERT used certain (deterministic) methods to estimate activity duration.
Correct Answer:
Verified
Q5: The difference between EST and LFT is
Q6: The difference between LFT and EFT is
Q7: An event is a series of connected
Q8: A big advantage of AON networks is
Q9: There is more than one way to
Q11: The difference between LST and LFT is
Q12: The shortest time to complete a network
Q13: A diagram of nodes connected by directional
Q14: The difference between LFT and EFT is
Q15: Milestones are not depended upon the predecessor