Solved

You Have Been Asked to Estimate the Costs for a Project

Question 34

Short Answer

You have been asked to estimate the costs for a project to build an industrial power plant. Based on historical data, the steam turbine accounts for 30 percent of the total costs for the plant. If the steam turbine costs $300,000, the expected top-down estimated cost for this project would be __________.

Correct Answer:

verifed

Verified

Unlock this answer now