The cost of the personnel department at the Speedy Process Company has always been charged to the production departments based upon number of employees. Recently, opinions gathered from the department managers indicated that the number of new hires might also be a predictor of personnel costs to be assigned. Total personnel department costs are $200.000.
Required:
Using the above data, prepare a report that contrasts the different amounts of personnel department cost that would be allocated to each of the production departments if the cost driver used is:
a.number of employees.
b.the number of new hires.
c.Which cost estimation method is being used by Speedy Company?
Correct Answer:
Verified
Q59: High Tech Manufacturing Inc., incurred total indirect
Q60: M & G TV and Appliance Store
Q61: The quantitative analysis method uses a formal
Q62: When using the high-low method, the two
Q63: In the estimation of a cost function
Q65: Which of the following is an example
Q66: Which of the following represents cross-sectional data?
A)
Q67: The cost to be predicted and managed
Q68: When using the high-low method, the numerator
Q69: A cost driver should be measurable and
Unlock this Answer For Free Now!