What is the key reason why a positive NPV project should be accepted?
A) The project is expected to increase shareholder value.
B) The present value of the expected cash flows equals the project's cost.
C) The project will produce positive cash flows in the future.
D) The project's payback will be positive during its life.
E) The project's PI will be less than 1,which indicates acceptance.
Correct Answer:
Verified
Q13: The length of time required for an
Q14: Net present value
A)considers only cash flows occurring
Q15: Assume a project has normal cash flows.Given
Q16: An investment
A)is acceptable if its calculated payback
Q17: An investment is acceptable if its average
Q19: The value of a firm
A)increases when a
Q20: Which methods of project analysis are most
Q21: Projects A and B require an initial
Q22: An investment is acceptable if the profitability
Q23: Two key weaknesses of the internal rate
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents