Tested product or system,training manuals,and user manuals are outputs of this phase.
A) conceptualization
B) design
C) implementation
D) closure
Correct Answer:
Verified
Q40: Constructing buildings as environmentally friendly and energy
Q41: Customer acceptance documents are an output of
Q42: Which of the following project life span
Q43: A detailed study in a controlled process
Q44: The first phase in the project life
Q46: During this phase,progress and success are measured,project
Q47: Factors that may cause project management to
Q48: Successful project management requires each of the
Q49: Project life span phases include each of
Q50: Project failure is caused by each of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents