Any material and labor costs that are necessary to complete a project,but do not become an actual part of the final project defines
A) nonspecific costs.
B) flexible costs.
C) indirect costs.
D) relaxed costs.
Correct Answer:
Verified
Q22: A RUE value above 1 indicates that
Q23: Costs that are constant regardless of changes
Q24: Project costs can be classified as each
Q25: Duration is defined as the total span
Q26: Every aspect of a project has a
Q28: RUI is an index that indicates how
Q29: If the SPI is equal to 1.5,then
Q30: A set of approval stages that are
Q31: If the SPI is .5,then the project
Q32: Resource planning steps include
A)level the resources.
B)construct a