An assembly line to be balanced has six tasks in precedence.The task times are shown in the following table.Based on demand forecasts,the output rate has to be 160 units per day.The line operates 8 hours a day.Compute the theoretical minimum amount of idle time (I) .
A) 0
B) 1
C) 2
D) 3
Correct Answer:
Verified
Q55: In selecting a process,we can plot the
Q56: An assembly line to be balanced
Q57: Which of the following rules assigns tasks
Q58: An assembly drawing shows _.
A)an enlarged view
Q59: Which of the following is NOT a
Q61: Which of the following helps organize work
Q62: The daily output required from an assembly
Q63: The daily output required from an assembly
Q64: A technique that provides a dynamic view
Q65: The relationship between two or more tasks