Shay is risk averse and has a reservation wage of $50.She is offered two different labor contracts.One is a fixed wage of $100 per day,and the other is a piece-rate contract.In the latter,the pay rate is $1 per piece.In a good day she sells 160 units,and in bad day she sells 40 units.The likelihood of a good or a bad day is 50%.
A) Shay accepts the fixed wage contract.
B) Shay declines both contracts.
C) Shay accepts the piece-rate contract.
D) Shay is indifferent between both contracts.
Correct Answer:
Verified
Q55: When is a piece-rate contract generally used?
A)
Q56: Assume a lawyer signs a contingency fee
Q57: With full information any contract will lead
Q58: In the presence of asymmetric information,production efficiency
Q59: Sarah's demand for routine medical visits is
Q61: If all firms pay an efficiency wage,then
A)
Q62: In 2008,foreclosures reached a record high.Which of
Q63: A profit-maximizing firm that uses an efficiency
Q64: An efficiency wage premium serves the same
Q65: A firm uses an efficiency wage scheme
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents