The goal of value-engineering is to
A) improve value-added activities.
B) eliminate or reduce non-value added activities.
C) both A and B.
D) none of the above.
Correct Answer:
Verified
Q159: The new manager at Sailboat Manufacturing oversees
Q160: Bohemian Manufacturing manufactures several different products and
Q161: Non-value added activities are
A)also called waste activities.
B)activities
Q166: Value-engineering is accomplished by eliminating,reducing,or simplifying all
Q167: Which of the following terms describes the
Q169: The movement of parts is considered a
Q175: Inspection is considered a non-value-added activity.
Q181: A system that focuses on activities as
Q183: Customer response time is the time that
Q199: Lean thinking is a management philosophy that
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents