The four building blocks of JIT are: product design,process design,personnel/organizational elements,and planning and control.
Correct Answer:
Verified
Q10: A JIT system uses long production runs
Q11: Reductions in setup time are necessary to
Q12: Continuous improvement and flexible systems are requirements
Q13: "Group technology" can be used to reduce
Q14: JIT was developed at the Ford Motor
Q14: The small lot-sizing policy works well in
Q17: Manufacturing cells are commonly used in JIT
Q18: Flexible systems undermine the goals of JIT
Q19: A benefit of JIT is the flexibility
Q20: In the JIT philosophy,the smaller the lot
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents