Why is the auditor more concerned with the risk of assessing control risk too low rather than the risk of assessing control risk too high?
A) The risk of assessing control risk too high is not a type of sampling risk.
B) The risk of assessing control risk too low exposes the auditor to an efficiency loss.
C) The risk of assessing control risk too low may result in the auditor failing to perform sufficient substantive procedures.
D) The risk of assessing control risk too low cannot be measured by the auditor during the sampling process.
Correct Answer:
Verified
Q23: Which of the following most closely represents
Q27: In performing variables sampling,the auditor will conclude
Q28: The precision interval has a _ percent
Q30: A sample selection method in which a
Q31: While performing an audit of accounts receivable,Allen,CPA,found
Q31: Which of the following does not affect
Q33: If the upper limit rate of deviation
Q36: Which of the following components of the
Q36: A disadvantage of using a systematic random
Q37: The method of sample selection in which
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents