Zero Company's standard factory overhead rate is $3.75 per direct labor hour (DLH) , calculated at 90% capacity = 900 standard DLHs. In December, the company operated at 80% of capacity, or 800 standard DLHs. Budgeted factory overhead at 80% of capacity is $3,150, of which $1,350 is fixed overhead. For December, the actual factory overhead cost was $3,800 for 840 actual DLHs, of which $1,300 was for fixed factory overhead.
Assuming a four-variance breakdown (decomposition) of the total overhead variance, what is the fixed factory overhead efficiency variance (to the nearest whole dollar) for the period?
A) N/A—this variance does not exist.
B) $225 favorable.
C) $425 unfavorable.
D) $650 unfavorable.
Correct Answer:
Verified
Q84: Bluecap Co. uses a standard cost
Q85: Bluecap Co. uses a standard cost
Q86: Bluecap Co. uses a standard cost
Q87: Neptune Inc. uses a standard cost
Q88: Zero Company's standard factory overhead rate is
Q90: At the denominator activity level, Norland Company's
Q91: Neptune Inc. uses a standard cost
Q92: At the denominator activity level, Norland Company's
Q93: Zero Company's standard factory overhead rate is
Q94: Neptune Inc. uses a standard cost
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents