According to the theory of constraints, a capacity-constrained resource (CCR) is one whose utilization is close to capacity and could be a bottleneck if it is not scheduled carefully.
Correct Answer:
Verified
Q43: Buffer inventory in front of a bottleneck
Q44: The synchronous manufacturing approach uses backward scheduling.
Q45: A process batch should be no larger
Q46: The "dollar days" inventory measurement can be
Q47: An MRP system can allow for product
Q49: On an assembly line, a transfer batch
Q50: One way to find a bottleneck is
Q51: Smaller transfer batches give lower work-in-process inventory
Q52: JIT requires work-in-process when used with Kanban
Q53: According to the theory of constraints, throughput